Holman Headquarters

Holman expanded its EV infrastructure at the Mount Laurel campus with the installation of 23 Level 2 chargers—11 at 3001 Leadenhall and 12 at 4001 Leadenhall. The project included full turn-key services: design, permitting, trenching, installation, commissioning, and AmpUp software integration. Each site features ADA-compliant chargers, coordinated striping, and signage in compliance with local codes.

Our team managed construction and electrical design, optimized existing infrastructure to avoid costly upgrades, and delivered chargers with real-time reporting, cellular connectivity, and access control for Holman employees. The solution supports Holman’s sustainability goals, provides scalable EV charging management, and establishes a flexible commute-neutral policy for employee use.

Location

Mt. Laurel, New Jersey

Gasoline Reduction

70,062 gal/yr

Grant Program

New Jersey Department of Environmental Protection

ENVIRONMENTAL IMPACT

132

Homes' Elecricity
Use Offset

23

Passenger Vehicles
Removed From the Road

101

Acres of U.S.
Forests Preserved For One Year

*Conversions done using the EPA Greenhouse Gas Equivalencies Calculator by ZIP Code. Estimates are based on 23 Level-2 chargers (~138,000 kWh/year), with assumptions of 3.3 mi/kWh, 26 mpg, and a 0.35 kg CO₂/kWh grid factor, using the EPA Equivalencies Calculator.